COMMERCIAL PROJECTS

Offices & Headquarters
Commercial Centers
Exhibition Centers
Showrooms
Industrial Entities


Mercedes Benz

KAEC, KSA

Situated in KAEC, the new Mercedes Benz truck
assembly facility is putting together the state of art
technology to locally assemble the newest model to
serve the local and regional market. On a 184,000
sqm lot this facility is composed on different
blocks and function all around a main factory
floor of 18,000 sqm, an office building, Roller test
and rework building, leak test facility, and a large
container yard.

Client Name:
Mercedes Benz – Juffali NAI
Completion Date
Under Bidding
Floor Area
21,455 sqm


Zahid Business Park

Jeddah, KSA

The site is located in the outskirt of Jeddah along the primary road of Madinah. The highly rational layout of the Complex accommodates the business groups of the Zahid Group, a counter-productive measure bringing the different divisions into one location. The park comprises Zahid Headquarters, CATTERPILLAR and VOLVO main regional branches.

Client Name:
Zahid Tractor
Completion Date
Under Construction
Floor Area
456,863 sqm

Client Name:
Zahid Tractor
Completion Date
2021
Floor Area
3,654 sqm


Art Center

Jeddah, KSA

As part of a message to the society, ZT offered to build an exhibition center at the forefront of
the newly developed project to be used for corporate and public events. The area is not dedicated
for indoors exhibition only but for outdoors as well. Combining a traditional with a fluid dynamic
modern steel structure; both will cover an area of 3,564 sqm with all required service spaces. 2
levels above ground as well as a basement for storage
and BOH.


Transportation Hub
Blols, France

Thermal Simulation, Optimization of the thermal
comfort and the energy consumption of the
administrative and workshop buildings.

Client Name:
Cities Aggloppolys
Completion Date
2011
Floor Area
2,600 sqm


Education Center, La Soie
Villeurbanne, France

Complete mission of Sustainability Design :
Implementation and follow-up of the process
of HQE® : Certification PEQA Effinergie +:
Management System, Environmental Quality of the
Building, Selection of Consultant

Client Name:
City of Villeurbanne
Completion Date
2020
Floor Area
3,000 sqm

Client Name:
Caterpillar & Zahid Tractor
Completion Date
Under Constraction
Floor Area
130,000 sqm


Caterpillar CMD Western Region
Jeddah, KSA

Situated on a 130,000sqm is a full fledge facility
to serve the western region of Saudi Arabia. Composed
of a heavy machinery workshop, a large scale
Warehouse and Engine Repair Center adjacent to full
function office services that cater to the needs
of the local sales and service customers.

In the photo on the right you can see that the
Atrium spaces link the entry level with the upper
floors, allowing sunlight to pour into both work and
social spaces.

Client Name:
Volvo – CVD
Completion Date
Under Constraction
Floor Area
53,000 sqm


Volvo CVD
Jeddah, KSA

This Volvo Renault Facility is combining the service
sales and marketing function in the western
region of Saudi Arabia. It combines the regional offices,
trucks showroom, a central parts warehouse,
& the service center. The project is positioned
and designed to take future expansion functions
whether for existing structure or for new
type of services.


Caterpillar Eastern Region
Dammam, KSA

Zahid Caterpillar Eastern region comprises the regional head-office, a sophisticated Engine Rebuild
Center, and a learning Institute. Located strategically on
Mina Road to serve its strong client base; the office building is composed of 3 floors, where as
the ERC and Institute are composed of 2 floors each. Solar systems are incorporated to provide
energy during day time
feeding directly into the project network.

Client Name:
Caterpillar Zahid Tractor
Completion Date
2018
Floor Area
40,000 sqm

Client Name:
Caterpillar – Altaaqa
Completion Date
Under Construction
Floor Area
435,000 sqm


Altaaqa Global Solution
Dubai, UAE

Energy is a key requirement for sustainable progress and development around the world. In Saudi
Arabia, the energy consumption is rising rapidly, driven by population growth, the swiftly
developing economy, and the rapidly increasing use of ever more energy- dependent technologies. ZT
facility combines the
components of a fully equipped facility.


Exhibition Center
Jeddah, KSA

It is part of a major development program is to
cater for art and exibition activities in the northern part of the city. The use is intended for
commercial activities such as launching a new prodict or service as well as for art and cultural
events. Inspired by modern interpretation of local elements; combined with tent like steel strucral
element that will host
outdoor events.

Client Name:
ZT
Completion Date
2020
Floor Area
4,200 sqm


Altaaqa – Caterpillar
Jeddah, KSA

A fully fledged facility in the northern part
of Jeddah consistingof 2 floors above ground for
Marketing, Sales and Regional administration.
State of the art technical support, field service
centers and parts are this regional hub.

Client Name:
Altaaqa Caterpillar
Completion Date
2020
Floor Area
33,200 sqm

Client Name:
Zahid Tractor
Completion Date
2021
Floor Area
1,362 sqm


SOS Lab
Jeddah, KSA

This lab is intended to represent flagship building &
attract the attention on the high volume of quality
testing. Spin off from the main building due to the
high traffic expected to generate throughout its
daily activities.
.

Client Name:
Mercedes Benz -Juffali JACO
Completion Date
2022
Floor Area
21,780 sqm


MB Riyadh Flagship
Riyadh, KSA

Located on a main Ring road in Riyadh, The new JACO Daimler Flagship showroom in the capital Riyadh Offers four levels of convenient services to its customers including one of the most technologically advanced service department. When designing the new showroom we carefully considered how to mirror this powerful combination to create a brand experience like no other. The new Mercedes-Benz Riyadh showroom will proudly display over 50 new cars and will have an elevator for cars serving all four levels.

Ground floor: Client entrance/Vehicle showroom/
Client lounge/Active service/Service bays
Mezzanine level: Administrative offices
First level: Extended vehicle showroom/VIP
lounge/Sales and F&I department/ Management
First basement: Customer/Staff parking
Second basement: Parking